Home 104
Creation date / 2013 / October

-
P8 Water proofing elevator shaft
-
P1 Preparing to remove steel wall
-
072) RH Construction early October
-
P5 Mud in treches after weekend of rain
-
P7 Mud being removed by backhoe
-
P 12 The supervisor
-
P11 View on October 4th
-
P6 Mud being removed by hand
-
P3 Back filling retaining wall
-
P9 Building commitee on site
-
P4 Drain rock behind retaining wall
-
P2 Back filling retaining wall
-
P10 Architenct on site
-
30-10466280436 b175435ea4 o
-
28-10466280075 a07b77485a o