Home 87
Creation date / 2016 / October
- Cooling unit for the walk-in refrigerator
- View on October 4th
- View on October 4th - from the parking lot
- Drain pipes going through the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen
- Talking to Heath about the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen
- Sidewalk outside the kitchen
- Back-filling the retaining walls
- Protecting the Reception Hall floor
- Samples of concrete floor stains
- Wainscoting being installed in basement hallways
- Stainless steel window sills in the kitchen
- Wainscot in basement hallway
- Light fixtures in the Children's Room