Home 4570

-
P9 Building commitee on site
-
P8 Water proofing elevator shaft
-
P7 Mud being removed by backhoe
-
P6 Mud being removed by hand
-
P5 Mud in treches after weekend of rain
-
P4 Drain rock behind retaining wall
-
P3 Back filling retaining wall
-
P2 Back filling retaining wall
-
P1 Preparing to remove steel wall
-
P 12 The supervisor
-
O18 The pour is finished
-
O17 Watching the pour
-
O16 Pumping concrete
-
O15 Forms for the foundation
-
O14 Inspecting hinges closely