Home 5194
- View on October 4th
- Back-filling the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Drain pipes going through the retaining walls
- Cooling unit for the walk-in refrigerator
- Sidewalk outside the kitchen
- Wainscoting being installed in basement hallways
- Samples of concrete floor stains
- Protecting the Reception Hall floor
- Talking to Heath about the retaining walls
- View on October 4th - from the parking lot
- Steve and Andy make a good team
- Protecting the soft sandstone from getting damaged
- Checking the level