Home 909
Creation date / 2016
« 2015
2017 »
January
February
March
April
May
June
July
August
September
October
November
December
All
- Sidewalk outside the kitchen
- Cooling unit for the walk-in refrigerator
- Drain pipes going through the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Back-filling the retaining walls
- View on October 4th
- Stainless steel window sills in the kitchen
- Wainscot in basement hallway
- Light fixtures in the Children's Room
- On demand water heaters
- Pipe rack in Utility Room, for the radiant floors
- Mud work in shower stall
- LED lights in ceiling
- Lighting in the library