Home 40
Creation date / 2007 / Week 2 / Monday
- N3 Installing 4-inch pipes
- M 8 Vapor Barrier being installed
- M 7 Vapor Barrier being installed
- M 6 Vapor barrier being cut
- M 5 Spreading rock
- M 4 Rock thrower
- M 3 Rock thrower
- M 2 Moving rock
- L 4 pouring the structural slab
- L 3 end of first pour
- K 6
- K 5
- Abhayagiri 2014 Album 022
- Abhayagiri 2014 Album 021
- Abhayagiri 2014 Album 006