Home 16
Creation date / 2013 / Week 40
- P8 Water proofing elevator shaft
- P1 Preparing to remove steel wall
- 072) RH Construction early October
- P5 Mud in treches after weekend of rain
- P7 Mud being removed by backhoe
- P 12 The supervisor
- P11 View on October 4th
- P6 Mud being removed by hand
- P3 Back filling retaining wall
- P9 Building commitee on site
- P4 Drain rock behind retaining wall
- P2 Back filling retaining wall
- P10 Architenct on site
- 30-10466280436 b175435ea4 o
- 28-10466280075 a07b77485a o