- P5 Mud in treches after weekend of rain
- 073) RH Construction end of October
- 073d) Reception Hall Construction Team
- 072) RH Construction early October
- P8 Water proofing elevator shaft
- P7 Mud being removed by backhoe
- L 2 vapor barrier installed
- L 7 the crew
- 031) JR's Anagarika Going Forth
- P1 Preparing to remove steel wall
- 008) Aj. Yatiko and Aj. Sannyamo in Sri Lanka
- L 1 vapor barrier installed
- O10 The jaws at work
- 20130618 164238
- O15 Forms for the foundation