Home 30
Creation date / 2013 / All / Friday
- K 4
- 073b) RH Construction begining of November
- L 6 structual slab complete
- L 5 pouring the structural slab
- O18 The pour is finished
- O17 Watching the pour
- O16 Pumping concrete
- 28-10466280075 a07b77485a o
- 30-10466280436 b175435ea4 o
- P10 Architenct on site
- P2 Back filling retaining wall
- P4 Drain rock behind retaining wall
- P9 Building commitee on site
- P3 Back filling retaining wall
- P6 Mud being removed by hand