Home 57
Creation date / All / Week 38
- 070b) RH Construction end of September 20th
- R9 View Sept 20th
- 11-48Abhayagiri-5
- Preparing the grounds for moving the Buddha
- Placing plywood to protect the concrete sidewalks
- Moving the madrone slab for the shrine from the workshop
- Loading the slab into the truck
- 700 lb slab of madrone needs many hands to safely move
- Moving the slab into the hall
- Madrone slab in the reception hall
- Flipping the slab over to check measurements
- Checking the measurements
- Setting the slab in place
- Admiring the beauty of the shrine
- Lifting the Buddha from it's temporary shelter