Home 5279

-
Cooling unit for the walk-in refrigerator
-
Sidewalk outside the kitchen
-
Wainscoting being installed in basement hallways
-
Samples of concrete floor stains
-
Protecting the Reception Hall floor
-
Talking to Heath about the retaining walls
-
View on October 4th - from the parking lot
-
Steve and Andy make a good team
-
Protecting the soft sandstone from getting damaged
-
Checking the level
-
Moving the madrone slab for the shrine from the workshop
-
Preparing the grounds for moving the Buddha
-
Final adjustments
-
Safely moved into place - our new Buddha
-
Attention to details