- L 1 vapor barrier installed
- L 2 vapor barrier installed
- L 3 end of first pour
- L 4 pouring the structural slab
- L 5 pouring the structural slab
- L 6 structual slab complete
- L 7 the crew
- M 1 Showing site to Thai guests
- M 2 Moving rock
- M 3 Rock thrower
- M 4 Rock thrower
- M 5 Spreading rock
- M 6 Vapor barrier being cut
- M 7 Vapor Barrier being installed
- M 8 Vapor Barrier being installed