- Final adjustments
- Flipping the slab over to check measurements
- Holding the Buddha steady
- Inviting the Buddha to be moved to the reception hall
- Levering the 3,000 lb Buddha into place
- Lifting the Buddha from it's temporary shelter
- Loading the slab into the truck
- Madrone slab in the reception hall
- Making sure the Buddha will go through the door
- Metal sheets to protect the shrine
- Moving the Buddha into place
- Moving the madrone slab for the shrine from the workshop
- Moving the slab into the hall
- Placing plywood to protect the concrete sidewalks
- Preparing concrete pour for sidewalk outside the kitchen