- Delicate balancing act
- Protecting the Reception Hall floor
- Cooling unit for the walk-in refrigerator
- Samples of concrete floor stains
- Setting the cart in place
- Holding the Buddha steady
- Making sure the Buddha will go through the door
- Wainscoting being installed in basement hallways
- Back-filling the retaining walls
- Admiring the beauty of the shrine
- View on October 4th
- Flipping the slab over to check measurements
- Preparing the grounds for moving the Buddha
- Drain pipes going through the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen