- Checking the level
- Talking to Heath about the retaining walls
- Tan Kondañño operating the heavy equipment
- Madrone slab in the reception hall
- Metal sheets to protect the shrine
- Lifting the Buddha from it's temporary shelter
- View on October 4th - from the parking lot
- Inviting the Buddha to be moved to the reception hall
- Setting the slab in place
- Moving the madrone slab for the shrine from the workshop
- Loading the slab into the truck
- Attention to details
- Sidewalk outside the kitchen
- 700 lb slab of madrone needs many hands to safely move
- Preparing concrete pour for sidewalk outside the kitchen