- Attempting to place a sheet of metal under the Buddha to protect the shrine
- Final adjustments
- Levering the 3,000 lb Buddha into place
- Almost on
- Safely moved into place - our new Buddha
- Steve and Andy make a good team
- Cooling unit for the walk-in refrigerator
- View on October 4th
- View on October 4th - from the parking lot
- Drain pipes going through the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen
- Talking to Heath about the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen
- Sidewalk outside the kitchen
- Back-filling the retaining walls