- Preparing concrete pour for sidewalk outside the kitchen
- Preparing the grounds for moving the Buddha
- Protecting the Reception Hall floor
- Protecting the soft sandstone from getting damaged
- Pulling the Buddha
- Ready for action
- Safely moved into place - our new Buddha
- Samples of concrete floor stains
- Setting the cart in place
- Setting the slab in place
- Sidewalk outside the kitchen
- Steve and Andy make a good team
- Talking to Heath about the retaining walls
- Tan Kondañño operating the heavy equipment
- Tight fit