- P5 Mud in treches after weekend of rain
- P4 Drain rock behind retaining wall
- P3 Back filling retaining wall
- P2 Back filling retaining wall
- P11 View on October 4th
- P10 Architenct on site
- P1 Preparing to remove steel wall
- P 12 The supervisor
- O18 The pour is finished
- O17 Watching the pour
- O16 Pumping concrete
- O15 Forms for the foundation
- O14 Inspecting hinges closely
- O13 Looking for a good door
- O12 View from the mailboxes Oct 7