- 10-BBP 2004 06
- 33-BBP 2004 11
- 34-BBP 2006 19
- 01-Abhayagiri Valley (41)
- L 3 end of first pour
- N3 Installing 4-inch pipes
- K 6
- M 8 Vapor Barrier being installed
- M 3 Rock thrower
- L 4 pouring the structural slab
- M 6 Vapor barrier being cut
- K 5
- M 2 Moving rock
- M 7 Vapor Barrier being installed
- M 5 Spreading rock