- CTTB Buddha hall art.
- Taking it in.
- Getting ready to leave CTTB
- Ajahn Sek
- Arriving at the Sudhana center.
- Intent.
- A community member who lost her house in the fire.
- Protecting the Reception Hall floor
- Samples of concrete floor stains
- Cooling unit for the walk-in refrigerator
- Wainscoting being installed in basement hallways
- View on October 4th
- Back-filling the retaining walls
- Drain pipes going through the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen