- Wainscoting being installed in basement hallways
- View on October 4th - from the parking lot
- View on October 4th
- Talking to Heath about the retaining walls
- Taking it in.
- Sidewalk outside the kitchen
- Samples of concrete floor stains
- Protecting the Reception Hall floor
- Preparing concrete pour for sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Intent.
- Getting ready to leave CTTB
- Drain pipes going through the retaining walls
- CTTB Buddha hall art.
- Cooling unit for the walk-in refrigerator