- Light fixtures in the Children's Room
- Micro-topping of concrete on basement floor
- Talking to Heath about the retaining walls
- Stainless steel window sills in the kitchen
- Wainscot in basement hallway
- Stained floor in Library
- Generousity gives rise to kusala
- Paneling for the reception hall
- Basement floor after staining
- View on October 4th - from the parking lot
- Guest and resident monks in attendance
- Mud work in shower stall
- Yangoon 4 (65)
- LED lights in ceiling
- Sidewalk outside the kitchen