- Checking the level
- Tan Kondañño operating the heavy equipment
- Madrone slab in the reception hall
- Metal sheets to protect the shrine
- Lifting the Buddha from it's temporary shelter
- Inviting the Buddha to be moved to the reception hall
- Setting the slab in place
- Moving the madrone slab for the shrine from the workshop
- Loading the slab into the truck
- 700 lb slab of madrone needs many hands to safely move
- Attention to details
- Placing plywood to protect the concrete sidewalks
- Checking the measurements
- Moving the slab into the hall
- Preparing the grounds for moving the Buddha