- Receiving alms from a lay supporter
- A newly-blooming succulent
- Checking the measurements
- Moving the slab into the hall
- Preparing concrete pour for sidewalk outside the kitchen
- Drain pipes going through the retaining walls
- Distributing rice for the ceremonial alms round
- Preparing the grounds for moving the Buddha
- Flipping the slab over to check measurements
- View on October 4th
- Back-filling the retaining walls
- Admiring the beauty of the shrine
- Wainscoting being installed in basement hallways
- Making sure the Buddha will go through the door
- Holding the Buddha steady