- Wainscoting being installed in basement hallways
- View on October 4th - from the parking lot
- View on October 4th
- Talking to Heath about the retaining walls
- Spacing tool for setting the maple paneling
- Sidewalk outside the kitchen
- Shower tile work continues
- Samples of concrete floor stains
- Rough mock-up - finished beams will look much nicer
- Reception Hall with maple paneling
- Protecting the Reception Hall floor
- Preparing concrete pour for sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Maple panel on one wall
- Last morning before Day-light saving ends