- Sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Talking to Heath about the retaining walls
- Preparing concrete pour for sidewalk outside the kitchen
- Drain pipes going through the retaining walls
- View on October 4th - from the parking lot
- View on October 4th
- Cooling unit for the walk-in refrigerator
- LP Thailand 23
- LP Thailand 22
- LP Thailand 20
- LP Thailand 21
- LP Thailand 19
- LP Thailand 18
- LP Thailand 17