- Spacing tool for setting the maple paneling
- Acoustic panels being installed
- Bathroom sink
- Talking to Heath about the retaining walls
- Shower tile work continues
- View on October 4th - from the parking lot
- LP Thailand 15
- Sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Drain pipes going through the retaining walls
- Reception Hall with maple paneling
- Faux beams for the Reception Hall ceiling
- View on October 4th
- Back-filling the retaining walls