- Safely moved into place - our new Buddha
- Final adjustments
- Preparing the grounds for moving the Buddha
- Moving the madrone slab for the shrine from the workshop
- Checking the level
- Protecting the soft sandstone from getting damaged
- Steve and Andy make a good team
- View on October 4th - from the parking lot
- Talking to Heath about the retaining walls
- Protecting the Reception Hall floor
- Samples of concrete floor stains
- Wainscoting being installed in basement hallways
- Sidewalk outside the kitchen
- Cooling unit for the walk-in refrigerator
- Drain pipes going through the retaining walls