- O18 The pour is finished
- 11-48Abhayagiri-5
- P5 Mud in treches after weekend of rain
- DSC07882
- P8 Water proofing elevator shaft
- O13 Looking for a good door
- M 1 Showing site to Thai guests
- DSC00636
- L 6 structual slab complete
- P7 Mud being removed by backhoe
- L 2 vapor barrier installed
- DSC07812
- DSC00602
- P6 Mud being removed by hand
- L 7 the crew