- 087) S. Suhajjo & An. Anthony
- 007) Winter Mountains
- L 3 end of first pour
- N3 Installing 4-inch pipes
- 079) Frog
- Abhayagiri 2014 Album 006
- 001) Monks During formal Confessing
- 006) 2013 Winter Retreat Crew
- K 6
- Abhayagiri 2014 Album 022
- M 8 Vapor Barrier being installed
- 018) Stupa site from Bhikkhu Commons
- 073a) RH Construction end of October
- M 3 Rock thrower
- L 4 pouring the structural slab