- Work to be done.
- Water after hard work
- Wainscoting being installed in basement hallways
- View on October 4th - from the parking lot
- View on October 4th
- Talking to Heath about the retaining walls
- Taking the tour of Sudhana center.
- Strong community
- Sidewalk outside the kitchen
- Samples of concrete floor stains
- Ryan hard at work as always.
- Returning to dorms after meal.
- Protecting the Reception Hall floor
- Preparing concrete pour for sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen