- Talking to Heath about the retaining walls
- View on October 4th - from the parking lot
- Sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Drain pipes going through the retaining walls
- View on October 4th
- Back-filling the retaining walls
- Wainscoting being installed in basement hallways
- Cooling unit for the walk-in refrigerator
- Samples of concrete floor stains
- A funny story in Thai.
- Protecting the Reception Hall floor
- Meal offering chant
- Returning to dorms after meal.