- Talking to Heath about the retaining walls
- View on October 4th - from the parking lot
- Sidewalk outside the kitchen
- Preparing concrete pour for sidewalk outside the kitchen
- Rice pindapat
- Preparing concrete pour for sidewalk outside the kitchen
- Drain pipes going through the retaining walls
- Rice pindapat
- View on October 4th
- Back-filling the retaining walls
- Wainscoting being installed in basement hallways
- During the Kathina ceremony
- Rice pindapat
- Cooling unit for the walk-in refrigerator
- Samples of concrete floor stains