Home 13
Creation date / 2013 / All / 1
- 073b) RH Construction begining of November
- L 6 structual slab complete
- L 5 pouring the structural slab
- P7 Mud being removed by backhoe
- P5 Mud in treches after weekend of rain
- 072) RH Construction early October
- P1 Preparing to remove steel wall
- P8 Water proofing elevator shaft
- 013) Tudong Departure
- IMG 0051
- 012) Aj. Nyaniko & Tan Thitabho before Tudong departure
- 129) Abhayagiri Valley at Dawn
- 129) Abhayagiri Valley at Dawn