Home 57
Creation date / 2016 / All / 14
- Lifting the Buddha from it's temporary shelter
- Admiring the beauty of the shrine
- Setting the slab in place
- Checking the measurements
- Flipping the slab over to check measurements
- Madrone slab in the reception hall
- Moving the slab into the hall
- 700 lb slab of madrone needs many hands to safely move
- Loading the slab into the truck
- Moving the madrone slab for the shrine from the workshop
- Placing plywood to protect the concrete sidewalks
- Preparing the grounds for moving the Buddha