- O18 The pour is finished
- P 12 The supervisor
- P1 Preparing to remove steel wall
- P10 Architenct on site
- P11 View on October 4th
- P2 Back filling retaining wall
- P3 Back filling retaining wall
- P4 Drain rock behind retaining wall
- P5 Mud in treches after weekend of rain
- P6 Mud being removed by hand
- P7 Mud being removed by backhoe
- P7020652
- P7020677
- P7020679
- P7030722